Combining natural fibers and recycled materials, this comfortable, lightweight long-sleeved top has a boxy, relaxed fit and a straight hem. The fabric is made with 60% organic cotton/40% recycled polyester slub knit and wears beautifully in warmer weather. Made in a Fair Trade Certified™ factory.
Features
Organic Cotton/Recycled Polyester Slub-Knit Fabric
The fabric is made with 60% organic cotton and 40% recycled polyester slub knit
Wide, Boxy, Relaxed Fit
Wide, boxy silhouette offers a relaxed fit; for a more traditional, closer-to-the-body fit, please size down
Dropped-Shoulder Design
Dropped-shoulder design for an easy fit and free range of motion
Straight Hem
Straight hem falls to the waist
Supporting the People Who Made This Product
Made in a Fair Trade Certified™ factory, which means the people who made this product earned a premium for their labor
Specs
- Fit: Relaxed
- Country of Origin: Made in Sri Lanka.
- Weight: 133 g (4.7 oz)
- Materials: 3.7-oz 60% organic cotton/40% recycled polyester slub knit
- Made in a Fair Trade Certified™ factory
- Care Instructions: Machine Wash Cold, Do Not Bleach, Tumble Dry Low, Cool Iron











